Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 26 of 26

clearance excel output should have both physical and thermal clearances for both wire to wire and ground clearances

physical as well as thermal (Ground and wire to wire) clearance for communication is required by the client to make clearance charts. (These were available in the previous version but not in new.)
3 days ago in SPIDAcalc 0 Needs review

Add Bookmark in the pdf report

in the previous version we had bookmarks for the pdf report which made it easier to check the analysis result.
3 days ago in SPIDAcalc 0 Needs review

Adjust elevation beyond span

Currently in SpidaCalc you can adjust the elevation between two WEP or pole structures. However, setting an anchor on an incline or decline (relative to the base of the pole) has a notable impact on the corresponding guy strength and vertical load...
9 days ago in SPIDAcalc 0 Needs review

Support Assemblies: preselect features included in support assembly prior to placement

With framing assemblies, the user can select the type of wires to be used in the assembly prior to placing. Support assemblies allows us to create common guying assemblies (such as 2 guys to 1 anchor, 2 guys to 2 anchors, and 4 guys to 4 anchors f...
9 days ago in SPIDAcalc 0 Needs review

Pulling remarks in a search function.

I would like the functionality to pull a "remarks" history search. As customers get more acquainted with Spida and begin to use remarks over email it would be nice to pull them. If at this time you're unable to pull all remarks, then adding a colu...
16 days ago in SPIDAstudio 0 Needs review

Individual Report Generation

It would be great to be able to batch generate separate PDF reports for each location in the SPIDA file. Currently we can generate one single PDF with every pole or we can check the individual poles and generate the report but we that is time inte...
27 days ago in SPIDAcalc 0 Needs review

Ownership change feature

If the ownership of the equipment is changed in spida, make it so analysis does not have to be run. Also, the poles can keep their current results? For example, if I had to change ownership on all poles in a project today from company#1 to company...
about 1 month ago in SPIDAcalc 0 Needs review

I would like to be able to use spida in the field on my IPAD.

No description provided
about 1 month ago in  0 Needs review

Extend SPIDAcalc API

Update the SPIDAcalc API to support: Reading project, form, lead, location, design, etc. properties Updating project, form, lead, location, design, etc. properties Getting the currently selected project, lead, location, or design Adding leads, loc...
3 months ago in SPIDAcalc 0 Needs review

SPIDACalc 24.1 Project Details Report Bookmarks

I noticed that for the update from 24.0 to 24.1, the Project Details Report PDF no longer exports with the ability to navigate in Bluebeam with bookmarks- this was very handy for the 24.0 version.
9 months ago in SPIDAcalc 2 Needs review